Exhibition stand builders at Farnborough International

Exhibition stand design and build at Farnborough International. Aerospace and defence show experience, structural approval, freight, install and dismantle.

Farnborough International serves aerospace, defence and heavy-engineering audiences, where stands carry real hardware and the compliance bar is higher than a standard trade show. We engineer for load, plan the lift, and handle the approvals that come with exhibiting physical product.

Farnborough International at a glance

Location
Farnborough, Hampshire GU14
Spaces
Halls 1–4 plus outdoor static display
Access
Level drive-in, strong floor loading
Typical build cost
£480–£900 per sqm single-storey
Speciality
Hardware display, load engineering, chalets

Halls and layout

Four connected halls with high clear height and strong floor loading, plus outdoor static display space. Hospitality chalets run alongside the show for airshow years, which changes the build programme significantly.

Venue rules that shape the design

  • Structural calculations required wherever product load is carried by the stand
  • Lifting plans and method statements for heavy exhibits
  • Security clearance and pass processes are stricter than a standard trade show
  • Airshow-year build windows are compressed — plan the programme early

How we build here

Where a stand carries machinery or airframe components we engineer the deck to the exhibit load, produce the lifting plan and coordinate the crane movement into the build schedule rather than treating it as a separate exercise.

Frequently asked questions

Can you build a stand that carries heavy hardware?
Yes. We engineer the deck and structure to the exhibit's actual load, produce the calculations and lifting plan, and schedule the lift inside the build programme so it does not eat into install time.
What does a Farnborough stand cost?
Custom single-storey builds typically run £480–£900 per sqm. Airshow-year builds with hospitality space and hardware display generally start around £48,000 and rise quickly with chalet fit-out.
Do you handle the security and pass process?
Yes — contractor passes, RAMS, insurance and the accreditation paperwork are managed by us as part of the build contract.

Minimum project £30,000. Send the brief and we return a budget band, format recommendation and outline timeline within 24 hours. Call +44 207 183 3436 or email info@pearllemongroup.com.