Messe Düsseldorf hosts some of the largest industrial trade fairs in the world, including drupa, K and Arab Health Europe. Stands here are large, technical and heavily engineered.
Key facts
- Country
- Germany
- Main venues
- Messe Düsseldorf, CCD Congress Center, Areal Böhler
- Shows covered
- 3 major shows
- Typical lead time
- 12–16 weeks for a custom build
- Minimum project
- £30,000
Venues we build in across Düsseldorf
- Messe Düsseldorf
- Nineteen halls with high floor loading and excellent rigging provision.
- CCD Congress Center
- Attached congress centre used for conference programmes alongside the fair.
- Areal Böhler
- Former steelworks used for launches and large brand events.
Düsseldorf build and logistics notes
- German structural calculations required for anything above 2.5m
- Hall allocations confirmed very late for the largest fairs
- Hotel rates multiply during drupa and K
In-house German structural documentation and Rhineland install crews accredited at Messe Düsseldorf.
Frequently asked questions
- Do you build stands at Messe Düsseldorf?
- Yes. We handle the structural submission, hall services order, freight, install and dismantle for exhibitors at drupa, K, Arab Health Europe and the wider Messe Düsseldorf calendar.
- How early should we book a Düsseldorf stand build?
- For the big industrial fairs, nine to twelve months. Double-deck approvals alone take around twelve weeks and crew availability tightens far earlier than in most European cities.
Minimum project £30,000. Send the brief and we return a budget band, format recommendation and outline timeline within 24 hours. Call +44 207 183 3436 or email info@pearllemongroup.com.